This project started in 2014 with Schley Nelson Architects conducting Phase 1 of a feasibility study to evaluate the condition and sizing of the existing facility relative to the department’s needs. Phase 2 of the study explored options for expanding the existing facility and determining the availability of viable alternative sites.
The study results determined that a complete rebuild at a new location was the best solution. Schley Nelson designed the five-stall two-way apparatus bays, two offices, a large education center, a workout room, a decontamination room and hose tower, a kitchen, and a lounge area.
Read on News Channel 3 about groundbreaking and grand opening, plus the published story in Firehouse Magazine.
Paw Paw Fire Department
Paw Paw, MI
20,000 sf
2023
$5.6 million
AVB
Construction Manager
Driesenga and Associates
Civil Engineer
The Barton Group
Owners Reperentative